Less than 1 minute ago
\r\n \r\n
Not really. Just a few days before we get them all finished up. There is about 5-6 operations in the mill to complete 1 set. They are normally bulk ran 1st operation, then 2op.. and so on. We ran operations 1-6 on all back ordered clip ons to get them out the door since everyone had been waiting so long. Now we are back to bulking them. They should be ready in a week or less.
\r\n
\r\n \r\n
\r\n
Quote:
\r\n | \r\n \r\n \r\n Back order again.. \r\n \r\n | \r\n
Not really. Just a few days before we get them all finished up. There is about 5-6 operations in the mill to complete 1 set. They are normally bulk ran 1st operation, then 2op.. and so on. We ran operations 1-6 on all back ordered clip ons to get them out the door since everyone had been waiting so long. Now we are back to bulking them. They should be ready in a week or less.
\r\n


